Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Specialty canning
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0037 #05 Y:2023 Increase amount of condensate returned $104,339 -
MU0037 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $6,677 $8,432
MU0037 #03 Y:2023 Insulate bare equipment $65,091 $242,014
MU0037 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $2,719 $180
MU0037 #01 Y:2023 Reduce space conditioning during non-working hours $206,493 $9,224
UU0179 #08 Y:2021 Insulate bare equipment $345 $747
UU0179 #07 Y:2021 Reschedule plant operations or reduce load to avoid peaks $617 $50
UU0179 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,013 $6,614
UU0179 #05 Y:2021 Lower temperature during the winter season and vice-versa $1,131 $100
UU0179 #04 Y:2021 Install vinyl strip / high speed / air curtain doors $1,472 $8,300
UU0179 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,891 $1,233
UU0179 #02 Y:2021 Use a less expensive method of waste removal $27,935 $2,000
UU0179 #01 Y:2021 Add equipment/ operators to reduce production bottleneck $72,600 $4,000
OR0704 #06 Y:2018 Modify facility to avoid excess maintenance costs $5,586 $14,266
OR0704 #05 Y:2018 Recover heat from exhausted steam, hot air or hot water $12,192 $2,161
OR0704 #04 Y:2018 Minimize water usage $28,545 $540
OR0704 #03 Y:2018 Use waste heat from hot flue gases to preheat $40,837 $72,155
OR0704 #02 Y:2018 Utilize a less expensive cooling method $127,144 $201,450
OR0704 #01 Y:2018 Use filter and drying oven to reduce sludge volume $510,333 $740,000
TR0002 #06 Y:2017 Recharge batteries on during off-peak demand periods $1,204 -