Assessment Year | 2023 |
---|---|
Principal Product | Baby foods |
NAICS | 311422: Specialty Canning |
SIC | 2032: Canned Specialties |
Sales Range | $100 M to 500M |
# of Employees | 525 |
Plant Area |
1,200,000
ft2
|
Annual Production | 83,405
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,156,199 | 37,170,235 |
kWh
|
$0.031 | |
Electricity Demand | $1,989,137 | 66,432 |
kW-mo/yr
|
$29.94 | |
Electricity Fees | $(-10,262.0) | - |
|
- | |
Natural Gas | $2,552,857 | 327,365 |
MMBtu
|
$7.80 | |
Waste Disposal Costs | |||||
Water Usage | $278,553 | 130,927 |
Tgal
|
$2.13 | |
TOTAL YEARLY COSTS | $5,966,485 | ||||
RECOMMENDED SAVINGS* | $385,319 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $172,149 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $206,493 | $9,224 |
$31,342
1,011,040
kWh
|
$41,470
-
kW-mo/yr
|
$133,681
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,719 | $180 |
$1,171
37,760
kWh
|
$1,549
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $65,091 | $242,014 | - | - |
$65,091
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,677 | $8,432 |
$2,874
92,710
kWh
|
$3,803
-
kW-mo/yr
|
- | - | |
05 | 2.2121: Increase amount of condensate returned | $104,339 | - | - | - |
$85,716
-
MMBtu
|
$18,623
-
Tgal
|
|
TOTAL RECOMMENDED | $385,319 | $259,850 |
$35,387
1,141,510
kWh
|
$46,821
-
kW-mo/yr
|
$284,488
-
MMBtu
|
$18,623
-
Tgal
|
||
TOTAL IMPLEMENTED | $172,149 | $242,194 |
$1,171
37,760
kWh
|
$1,549
-
kW-mo/yr
|
$150,807
-
MMBtu
|
$18,623
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs