ITAC Assessment: MU0037
ITAC logo
ITAC Assessment: MU0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Baby foods
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 525
Plant Area 1,200,000
ft2
Annual Production 83,405
ton
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,156,199 37,170,235
kWh
Electricity Demand $1,989,137 66,432
kW-mo/yr
Electricity Fees $(-10,262.0) -
Natural Gas $2,552,857 327,365
MMBtu
Waste Disposal Costs
Water Usage $278,553 130,927
Tgal
TOTAL YEARLY COSTS $5,966,485
RECOMMENDED SAVINGS* $385,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $172,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7224: Reduce space conditioning during non-working hours $206,493 $9,224 $31,342
1,011,040
kWh
$41,470
-
kW-mo/yr
$133,681
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,719 $180 $1,171
37,760
kWh
$1,549
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $65,091 $242,014 - - $65,091
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,677 $8,432 $2,874
92,710
kWh
$3,803
-
kW-mo/yr
- -
05 2.2121: Increase amount of condensate returned $104,339 - - - $85,716
-
MMBtu
$18,623
-
Tgal
TOTAL RECOMMENDED $385,319 $259,850 $35,387
1,141,510
kWh
$46,821
-
kW-mo/yr
$284,488
-
MMBtu
$18,623
-
Tgal
TOTAL IMPLEMENTED $172,149 $242,194 $1,171
37,760
kWh
$1,549
-
kW-mo/yr
$150,807
-
MMBtu
$18,623
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs