| Assessment Year | 2021 |
|---|---|
| Principal Product | Canned Goods |
| NAICS | 311422: Specialty Canning |
| SIC | 2032: Canned Specialties |
| Sales Range | $500 k to 1M |
| # of Employees | 8 |
| Plant Area |
26,900
ft2
|
| Annual Production | 4,824,000
units
|
| Production Hrs. Annual | 2,400
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $24,466 | 661,160 |
kWh
|
$0.037 | |
| Electricity Demand | $43,338 | 2,581 |
kW-mo/yr
|
$16.79 | |
| Electricity Fees | $8,556 | - |
|
- | |
| Natural Gas | $15,198 | 5,141 |
MMBtu
|
$2.96 | |
| Waste Disposal Costs | |||||
| Water Usage | $14,707 | 4,348 |
Tgal
|
$3.38 | |
| TOTAL YEARLY COSTS | $106,265 | ||||
| RECOMMENDED SAVINGS* | $108,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $30,079 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.111: Add equipment/ operators to reduce production bottleneck | $72,600 | $4,000 | - | - | - | $72,600 | - | |
| 02 | 3.6192: Use a less expensive method of waste removal | $27,935 | $2,000 | - | - | - | - | $27,935 | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,891 | $1,233 |
$1,783
48,180
kWh
|
$1,108
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,472 | $8,300 |
$(-47.4)
(-1,280)
kWh
|
- |
$1,519
-
MMBtu
|
- | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,131 | $100 |
$215
5,801
kWh
|
- |
$916
-
MMBtu
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,013 | $6,614 |
$348
9,406
kWh
|
$665
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $617 | $50 |
$617
16,663
kWh
|
- | - | - | - | |
| 08 | 2.2511: Insulate bare equipment | $345 | $747 | - | - |
$345
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $108,004 | $23,044 |
$2,915
78,770
kWh
|
$1,773
-
kW-mo/yr
|
$2,781
-
MMBtu
|
$72,600 | $27,935 | ||
| TOTAL IMPLEMENTED | $30,079 | $8,714 |
$563
15,207
kWh
|
$665
-
kW-mo/yr
|
$916
-
MMBtu
|
- | $27,935 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs