ITAC Assessment: UU0179
ITAC logo
ITAC Assessment: UU0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Canned Goods
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $500
k
to 1
M
# of Employees 8
Plant Area 26,900
ft2
Annual Production 4,824,000
units
Production Hrs. Annual 2,400
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,466 661,160
kWh
Electricity Demand $43,338 2,581
kW-mo/yr
Electricity Fees $8,556 -
Natural Gas $15,198 5,141
MMBtu
Waste Disposal Costs
Water Usage $14,707 4,348
Tgal
TOTAL YEARLY COSTS $106,265
RECOMMENDED SAVINGS* $108,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $72,600 $4,000 - - - $72,600 -
02 3.6192: Use a less expensive method of waste removal $27,935 $2,000 - - - - $27,935
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,891 $1,233 $1,783
48,180
kWh
$1,108
-
kW-mo/yr
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,472 $8,300 $(-47.4)
(-1,280)
kWh
- $1,519
-
MMBtu
- -
05 2.7221: Lower temperature during the winter season and vice-versa $1,131 $100 $215
5,801
kWh
- $916
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,013 $6,614 $348
9,406
kWh
$665
-
kW-mo/yr
- - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $617 $50 $617
16,663
kWh
- - - -
08 2.2511: Insulate bare equipment $345 $747 - - $345
-
MMBtu
- -
TOTAL RECOMMENDED $108,004 $23,044 $2,915
78,770
kWh
$1,773
-
kW-mo/yr
$2,781
-
MMBtu
$72,600 $27,935
TOTAL IMPLEMENTED $30,079 $8,714 $563
15,207
kWh
$665
-
kW-mo/yr
$916
-
MMBtu
- $27,935
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs