ITAC Assessment: OR0704
ITAC logo
ITAC Assessment: OR0704
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Soups, Milks, Broths
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 60
Plant Area 871,200
ft2
Annual Production 11,300,000
units
Production Hrs. Annual 8,424
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,042,478 16,035,157
kWh
Electricity Demand $132,083 36,372
kW-mo/yr
Electricity Fees $72,618 -
Natural Gas $783,293 195,712
MMBtu
Fuel Oil #1 $17,762 6,482
MMBtu
Waste Disposal Costs
Water Usage $275,761 78,744
Tgal
Water Disposal $12,149 4,685
Tgal
Other Liquid (non-haz) $277,333 1,933,333
gal
Gaseous Waste $233,000 2,900,000
lb
TOTAL YEARLY COSTS $2,846,477
RECOMMENDED SAVINGS* $724,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,144

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings Administrative Changes Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $510,333 $740,000 - - - - - - $277,333
-
gal
$233,000
-
lb
- -
02 2.2628: Utilize a less expensive cooling method $127,144 $201,450 $(-8,893.0)
(-135,353)
kWh
$(-64.0)
-
kW-mo/yr
- $17,762
-
MMBtu
- - - - - $118,339
03 2.2414: Use waste heat from hot flue gases to preheat $40,837 $72,155 - - $40,837
-
MMBtu
- - - - - - -
04 3.4151: Minimize water usage $28,545 $540 - - - - $16,396
-
Tgal
$12,149
-
Tgal
- - - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $12,192 $2,161 - - $12,192
-
MMBtu
- - - - - - -
06 4.463: Modify facility to avoid excess maintenance costs $5,586 $14,266 $(-1,282.0)
(-19,507)
kWh
- $2,621
-
MMBtu
- $1,790
-
Tgal
- - - $2,457 -
TOTAL RECOMMENDED $724,637 $1,030,572 $(-10,175.0)
(-154,860)
kWh
$(-64.0)
-
kW-mo/yr
$55,650
-
MMBtu
$17,762
-
MMBtu
$18,186
-
Tgal
$12,149
-
Tgal
$277,333
-
gal
$233,000
-
lb
$2,457 $118,339
TOTAL IMPLEMENTED $127,144 $201,450 $(-8,893.0)
(-135,353)
kWh
$(-64.0)
-
kW-mo/yr
- $17,762
-
MMBtu
- - - - - $118,339
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs