Assessment Year | 2018 |
---|---|
Principal Product | Soups, Milks, Broths |
NAICS | 311422: Specialty Canning |
SIC | 2032: Canned Specialties |
Sales Range | $100 M to 500M |
# of Employees | 60 |
Plant Area |
871,200
ft2
|
Annual Production | 11,300,000
units
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,042,478 | 16,035,157 |
kWh
|
$0.065 | |
Electricity Demand | $132,083 | 36,372 |
kW-mo/yr
|
$3.63 | |
Electricity Fees | $72,618 | - |
|
- | |
Natural Gas | $783,293 | 195,712 |
MMBtu
|
$4.00 | |
Fuel Oil #1 | $17,762 | 6,482 |
MMBtu
|
$2.74 | |
Waste Disposal Costs | |||||
Water Usage | $275,761 | 78,744 |
Tgal
|
$3.50 | |
Water Disposal | $12,149 | 4,685 |
Tgal
|
$2.59 | |
Other Liquid (non-haz) | $277,333 | 1,933,333 |
gal
|
$0.14 | |
Gaseous Waste | $233,000 | 2,900,000 |
lb
|
$0.080 | |
TOTAL YEARLY COSTS | $2,846,477 | ||||
RECOMMENDED SAVINGS* | $724,637 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $127,144 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Water Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Gaseous Waste Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6112: Use filter and drying oven to reduce sludge volume | $510,333 | $740,000 | - | - | - | - | - | - |
$277,333
-
gal
|
$233,000
-
lb
|
- | - | |
02 | 2.2628: Utilize a less expensive cooling method | $127,144 | $201,450 |
$(-8,893.0)
(-135,353)
kWh
|
$(-64.0)
-
kW-mo/yr
|
- |
$17,762
-
MMBtu
|
- | - | - | - | - | $118,339 | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $40,837 | $72,155 | - | - |
$40,837
-
MMBtu
|
- | - | - | - | - | - | - | |
04 | 3.4151: Minimize water usage | $28,545 | $540 | - | - | - | - |
$16,396
-
Tgal
|
$12,149
-
Tgal
|
- | - | - | - | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $12,192 | $2,161 | - | - |
$12,192
-
MMBtu
|
- | - | - | - | - | - | - | |
06 | 4.463: Modify facility to avoid excess maintenance costs | $5,586 | $14,266 |
$(-1,282.0)
(-19,507)
kWh
|
- |
$2,621
-
MMBtu
|
- |
$1,790
-
Tgal
|
- | - | - | $2,457 | - | |
TOTAL RECOMMENDED | $724,637 | $1,030,572 |
$(-10,175.0)
(-154,860)
kWh
|
$(-64.0)
-
kW-mo/yr
|
$55,650
-
MMBtu
|
$17,762
-
MMBtu
|
$18,186
-
Tgal
|
$12,149
-
Tgal
|
$277,333
-
gal
|
$233,000
-
lb
|
$2,457 | $118,339 | ||
TOTAL IMPLEMENTED | $127,144 | $201,450 |
$(-8,893.0)
(-135,353)
kWh
|
$(-64.0)
-
kW-mo/yr
|
- |
$17,762
-
MMBtu
|
- | - | - | - | - | $118,339 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Water Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Gaseous Waste Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs