matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0826 #05 Y:2026 | 05 | 2026 | Install common header on compressors | $3,389 | $17,947 |
n/a
|
| OR0826 #04 Y:2026 | 04 | 2026 | Use heat from boiler blowdown to preheat boiler feed water | $1,494 | $6,047 |
n/a
|
| OR0826 #03 Y:2026 | 03 | 2026 | Optimize plant power factor | $13,756 | $35,271 |
n/a
|
| OR0826 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $3,164 | $698 |
n/a
|
| OR0826 #01 Y:2026 | 01 | 2026 | Pay utility bills on time | $3,568 | - |
n/a
|
| OR0802 #04 Y:2024 | 04 | 2024 | Replace boiler | $37,073 | $222,038 | |
| OR0802 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,483 | $499 | |
| OR0802 #02 Y:2024 | 02 | 2024 | Insulate bare equipment | $2,952 | $500 | |
| OR0802 #01 Y:2024 | 01 | 2024 | Eliminate or reduce compressed air usage | $1,248 | $147 | |
| OR0704 #06 Y:2018 | 06 | 2018 | Modify facility to avoid excess maintenance costs | $5,586 | $14,266 | |
| OR0704 #05 Y:2018 | 05 | 2018 | Recover heat from exhausted steam, hot air or hot water | $12,192 | $2,161 | |
| OR0704 #04 Y:2018 | 04 | 2018 | Minimize water usage | $28,545 | $540 | |
| OR0704 #03 Y:2018 | 03 | 2018 | Use waste heat from hot flue gases to preheat | $40,837 | $72,155 | |
| OR0704 #02 Y:2018 | 02 | 2018 | Utilize a less expensive cooling method | $127,144 | $201,450 | |
| OR0704 #01 Y:2018 | 01 | 2018 | Use filter and drying oven to reduce sludge volume | $510,333 | $740,000 | |
| OR0653 #06 Y:2015 | 06 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,625 | $1,000 | |
| OR0653 #05 Y:2015 | 05 | 2015 | Modify refrigeration system to operate at a lower pressure | $4,262 | $15,398 | |
| OR0653 #04 Y:2015 | 04 | 2015 | Utilize controls to operate equipment only when needed | $611 | $1,058 | |
| OR0653 #03 Y:2015 | 03 | 2015 | Use optimum thickness insulation | $3,897 | $4,580 | |
| OR0653 #02 Y:2015 | 02 | 2015 | Flash condensate to produce lower pressure steam | $36,536 | $30,728 |