Assessment Year 2015
Principal Product Fruit Puree
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 65,340
ft2
Annual Production 6,500
Tgal
Production Hrs. Annual 6,336
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,410 6,027,628
kWh
Electricity Demand $171,292 19,206
kW-mo/yr
Electricity Fees $46,188 -
Natural Gas $734,781 154,885
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Water Consumption Savings
01 2.2121: Increase amount of condensate returned $118,419 $40,792 - - $46,488
-
MMBtu
$19,340
-
gal
$52,591
-
Tgal
02 2.2127: Flash condensate to produce lower pressure steam $36,536 $30,728 - - $36,536
-
MMBtu
- -
03 2.2515: Use optimum thickness insulation $3,897 $4,580 - - $3,897
-
MMBtu
- -
04 2.6231: Utilize controls to operate equipment only when needed $611 $1,058 $611
10,562
kWh
- - - -
05 2.2621: Modify refrigeration system to operate at a lower pressure $4,262 $15,398 $2,915
50,409
kWh
$1,347
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,625 $1,000 $1,606
29,373
kWh
$19
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $165,350 $93,556 $5,132
90,344
kWh
$1,366
-
kW-mo/yr
$86,921
-
MMBtu
$19,340
-
gal
$52,591
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs