ITAC Assessment: OR0826
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Dehydrated Onion
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 172,000
ft2
Annual Production 33,000,000
lb
Production Hrs. Annual 4,632
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $472,039 10,209,960
kWh
Electricity Demand $150,988 23,268
kW-mo/yr
Electricity Fees $29,907 -
Natural Gas $1,273,531 292,352
MMBtu
TOTAL YEARLY COSTS $1,926,465
RECOMMENDED SAVINGS* $25,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $3,568 - - $3,568 - -
02 2.2511: Insulate bare equipment $3,164 $698 - - $3,164
-
MMBtu
-
03 2.3212: Optimize plant power factor $13,756 $35,271 - - - $13,756
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $1,494 $6,047 - - $1,494
-
MMBtu
-
05 2.4225: Install common header on compressors $3,389 $17,947 $3,389
73,306
kWh
- - -
TOTAL RECOMMENDED $25,371 $59,963 $3,389
73,306
kWh
$3,568 $4,658
-
MMBtu
$13,756
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs