Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen specialty food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0127 #04 Y:2014 Replace steam jets on vacuum system with electric motor driven vacuum pumps $1,200 $1,800
DL0127 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $100
DL0127 #02 Y:2014 Replace existing chiller with high efficiency model $6,800 $2,100
DL0127 #01 Y:2014 Utilize controls to operate equipment only when needed $6,800 $100
MI0257 #09 Y:2013 Install occupancy sensors $2,579 $290
MI0257 #08 Y:2013 Reduce illumination to minimum necessary levels $3,989 $440
MI0257 #07 Y:2013 Optimize plant power factor $4,923 $5,360
MI0257 #06 Y:2013 Lower temperature during the winter season and vice-versa $5,027 $80
MI0257 #05 Y:2013 Clean or color roof to reduce solar load $6,335 $2,660
MI0257 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $7,995 $13,902
MI0257 #03 Y:2013 Insulate glazing, walls, ceilings, and roofs $13,113 $19,160
MI0257 #02 Y:2013 Turn off equipment when not in use $13,943 $3,100
MI0257 #01 Y:2013 Turn off equipment when not in use $68,259 $15,600
BS0002 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $9,906 $14,400
BS0002 #04 Y:2012 Reduce / eliminate use of disposable product $6,492 $5,600
BS0002 #03 Y:2012 Turn off equipment during breaks, reduce operating time $484 $580
BS0002 #02 Y:2012 Re-arrange equipment layout to reduce labor costs $106 $320
BS0002 #01 Y:2012 Install occupancy sensors $1,803 $3,000
WV0429 #13 Y:2011 Keep doors and windows shut when not on use $438 $3,900
WV0429 #12 Y:2011 Minimize operation of equipment maintained in standby condition $562 $256