ITAC Assessment: WV0429
ITAC logo
ITAC Assessment: WV0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product frozen food products
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 70,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,342 3,039,359
kWh
Electricity Demand $37,924 4,989
kW-mo/yr
Electricity Fees $4,966 -
Natural Gas $28,560 2,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7232: Replace existing hvac unit with high efficiency model $43,406 $443,960 $37,539
563,907
kWh
$5,867
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,142 $20,962 $21,702
326,001
kWh
$2,440
-
kW-mo/yr
- -
03 2.7492: Use proper thickness of insulation on building envelope $13,356 $22,155 $11,547
173,456
kWh
$1,809
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,566 $38,070 $8,274
124,289
kWh
$1,292
-
kW-mo/yr
- -
05 3.2172: Use automatic cleaning equipment $8,708 $53,000 $(-882.0)
(-13,243)
kWh
- $8,888
-
MMBtu
$702
-
Tgal
06 2.6218: Turn off equipment when not in use $5,791 $547 $5,791
86,995
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,932 $3,252 $4,263
64,044
kWh
$669
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,606 $7,343 $4,249
63,824
kWh
$357
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $2,747 $444 $2,512
37,728
kWh
$235
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $904 $1,224 $782
11,741
kWh
$122
-
kW-mo/yr
- -
11 2.4322: Use or replace with energy efficient substitutes $616 $3,934 - - $616
-
MMBtu
-
12 2.6242: Minimize operation of equipment maintained in standby condition $562 $256 - - $562
-
MMBtu
-
13 2.7442: Keep doors and windows shut when not on use $438 $3,900 $332
4,981
kWh
$106
-
kW-mo/yr
- -
TOTAL RECOMMENDED $119,774 $599,047 $96,109
1,443,723
kWh
$12,897
-
kW-mo/yr
$10,066
-
MMBtu
$702
-
Tgal
TOTAL IMPLEMENTED $16,329 $15,298 $14,635
219,844
kWh
$1,132
-
kW-mo/yr
$562
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings