ITAC Assessment: MUWT06
ITAC logo
ITAC Assessment: MUWT06
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 18
Plant Area 410,613
ft2
Annual Production 4,220,933
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,146 4,401,320
kWh
Electricity Demand $321,309 31,244
kW-mo/yr
Electricity Fees $44,151 -
Natural Gas $308,855 48,133
MMBtu
Other Energy $5,254 1
MMBtu
TOTAL YEARLY COSTS $1,026,714
RECOMMENDED SAVINGS* $40,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $669 $4,646 $569
7,109
kWh
$100
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $106 - $3
43
kWh
$103
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20 $20 $17
215
kWh
$3
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $12,582 $8,363 $10,695
133,683
kWh
$1,888
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,139 $563 $491
6,140
kWh
$648
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,226 $5,494 $2,391
29,889
kWh
$835
-
kW-mo/yr
- -
07 2.7221: Lower temperature during the winter season and vice-versa $11,231 - - - $11,231
-
MMBtu
-
08 2.7224: Reduce space conditioning during non-working hours $1,263 - - - $1,263
-
MMBtu
-
09 2.7492: Use proper thickness of insulation on building envelope $2,478 $6,690 - - $2,478
-
MMBtu
-
10 4.821: Pay bills on time to avoid late fees $7,951 - - - - $7,951
TOTAL RECOMMENDED $40,665 $25,777 $14,166
177,080
kWh
$3,576
-
kW-mo/yr
$14,972
-
MMBtu
$7,951
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs