| Assessment Year | 2024 |
|---|---|
| Principal Product | Treated wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 18 |
| Plant Area |
410,613
ft2
|
| Annual Production | 4,220,933
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $347,146 | 4,401,320 |
kWh
|
$0.079 |
| Electricity Demand | $321,309 | 31,244 |
kW-mo/yr
|
$10.28 |
| Electricity Fees | $44,151 | - |
|
- |
| Natural Gas | $308,855 | 48,133 |
MMBtu
|
$6.42 |
| Other Energy | $5,254 | 1 |
MMBtu
|
$5,253.83 |
| TOTAL YEARLY COSTS | $1,026,714 | |||
| RECOMMENDED SAVINGS* | $40,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $669 | $4,646 |
$569
7,109
kWh
|
$100
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $106 | - |
$3
43
kWh
|
$103
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20 | $20 |
$17
215
kWh
|
$3
-
kW-mo/yr
|
- | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $12,582 | $8,363 |
$10,695
133,683
kWh
|
$1,888
-
kW-mo/yr
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $1,139 | $563 |
$491
6,140
kWh
|
$648
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,226 | $5,494 |
$2,391
29,889
kWh
|
$835
-
kW-mo/yr
|
- | - | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $11,231 | - | - | - |
$11,231
-
MMBtu
|
- | |
| 08 | 2.7224: Reduce space conditioning during non-working hours | $1,263 | - | - | - |
$1,263
-
MMBtu
|
- | |
| 09 | 2.7492: Use proper thickness of insulation on building envelope | $2,478 | $6,690 | - | - |
$2,478
-
MMBtu
|
- | |
| 10 | 4.821: Pay bills on time to avoid late fees | $7,951 | - | - | - | - | $7,951 | |
| TOTAL RECOMMENDED | $40,665 | $25,777 |
$14,166
177,080
kWh
|
$3,576
-
kW-mo/yr
|
$14,972
-
MMBtu
|
$7,951 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs