ITAC Assessment: OK0262
ITAC logo
ITAC Assessment: OK0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AIRCRAFT FILTERS, ETC.
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,953 3,832,943
kWh
Natural Gas $42,272 13,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $15,713 $3,089 - $15,713
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $2,723 - - $2,723
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $495 - $535
17,878
kWh
- $(-40.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,786 - $3,786
127,491
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $982 $840 $982
18,171
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,610 $9,800 $2,542
70,047
kWh
- $68
TOTAL RECOMMENDED $26,309 $13,729 $7,845
233,587
kWh
$18,436
-
MMBtu
$28
TOTAL IMPLEMENTED $20,976 $3,929 $5,303
163,540
kWh
$15,713
-
MMBtu
$(-40.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs