ITAC Assessment: BS0002
ITAC logo
ITAC Assessment: BS0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Frozen Foods
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 478,485
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $717,826 22,115,485
kWh
Electricity Demand $334,975 138,481
kW-mo/yr
Electricity Fees $3,119 -
Natural Gas $491,116 120,341
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $1,803 $3,000 $1,246
38,400
kWh
$557
-
kW-mo/yr
-
02 4.513: Re-arrange equipment layout to reduce labor costs $106 $320 $87
2,667
kWh
$19
-
kW-mo/yr
-
03 2.6212: Turn off equipment during breaks, reduce operating time $484 $580 $484
14,920
kWh
- -
04 3.7198: Reduce / eliminate use of disposable product $6,492 $5,600 $(-18.3)
(-563)
kWh
$(-156.8)
-
kW-mo/yr
$6,667
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,906 $14,400 $8,096
249,421
kWh
$1,810
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,792 $23,900 $9,895
304,845
kWh
$2,230
-
kW-mo/yr
$6,667
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs