Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen specialty food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0179 #08 Y:2017 Insulate bare equipment $429 $247
UA0179 #07 Y:2017 Reduce combustion air flow to optimum $2,673 $7,500
UA0179 #06 Y:2017 Use waste heat from hot flue gases to preheat $6,934 $6,152
UA0179 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $10,243 $1,165
UA0179 #04 Y:2017 Reduce the pressure of compressed air to the minimum required $7,851 $250
UA0179 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $26,876 $42,452
UA0179 #02 Y:2017 Modify refrigeration system to operate at a lower pressure $44,167 $500
UA0179 #01 Y:2017 Recover waste heat from equipment $53,482 $100,000
MZ0215 #04 Y:2016 Lower temperature during the winter season and vice-versa $567 -
MZ0215 #03 Y:2016 Install occupancy sensors $1,093 $220
MZ0215 #02 Y:2016 Insulate bare equipment $2,514 $1,500
MZ0215 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $7,397 $8,400
BS0073 #07 Y:2016 Use waste heat from hot flue gases to preheat $2,966 $15,800
BS0073 #06 Y:2016 Isolate steam lines to avoid heating air conditioned areas $582 $316
BS0073 #05 Y:2016 Install compressor air intakes in coolest locations $2,122 $220
BS0073 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $108 $47
BS0073 #03 Y:2016 Use optimum temperature $419 $116
BS0073 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $506 $960
BS0073 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $151 $2,312
NC0518 #13 Y:2014 Install occupancy sensors $437 $774