ITAC Assessment: BS0073
ITAC logo
ITAC Assessment: BS0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Packaged Frozen Food
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 233
Plant Area 110,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 6,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $422,366 9,590,800
kWh
Electricity Demand $163,175 20,120
kW-mo/yr
Natural Gas $498,235 132,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $151 $2,312 $111
2,534
kWh
$40
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $506 $960 $404
9,180
kWh
$102
-
kW-mo/yr
-
03 2.2211: Use optimum temperature $419 $116 $419
9,513
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $108 $47 $82
1,865
kWh
$26
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,122 $220 $1,692
38,456
kWh
$430
-
kW-mo/yr
-
06 2.2521: Isolate steam lines to avoid heating air conditioned areas $582 $316 - - $582
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $2,966 $15,800 - - $2,966
-
MMBtu
TOTAL RECOMMENDED $6,853 $19,771 $2,708
61,548
kWh
$597
-
kW-mo/yr
$3,548
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs