Assessment Year | 2017 |
---|---|
Principal Product | Frozen Corndogs |
NAICS | 311412: Frozen Specialty Food Manufacturing |
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
200,000
ft2
|
Annual Production | 350,000,000
units
|
Production Hrs. Annual | 6,480
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,520,435 | 20,028,110 |
kWh
|
$0.076 |
Electricity Fees | $112,553 | - |
|
- |
Natural Gas | $467,335 | 62,181 |
MMBtu
|
$7.52 |
TOTAL YEARLY COSTS | $2,100,323 | |||
RECOMMENDED SAVINGS* | $159,897 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $53,482 | $100,000 | - | - |
$53,482
-
MMBtu
|
|
02 | 2.2621: Modify refrigeration system to operate at a lower pressure | $44,167 | $500 |
$41,813
550,755
kWh
|
$2,354 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,876 | $42,452 |
$25,444
335,171
kWh
|
$1,432 | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,851 | $250 |
$7,433
97,903
kWh
|
$418 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,243 | $1,165 |
$9,721
122,120
kWh
|
$522 | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $6,934 | $6,152 | - | - |
$6,934
-
MMBtu
|
|
07 | 2.1113: Reduce combustion air flow to optimum | $2,673 | $7,500 | - | - |
$2,673
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $429 | $247 | - | - |
$429
-
MMBtu
|
|
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,242 | $1,015 |
$6,856
90,311
kWh
|
$386 | - | |
TOTAL RECOMMENDED | $159,897 | $159,281 |
$91,267
1,196,260
kWh
|
$5,112 |
$63,518
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,765 | $2,677 |
$24,010
310,334
kWh
|
$1,326 |
$429
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs