ITAC Assessment: AS0095
ITAC logo
ITAC Assessment: AS0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PREC MECHANICAL PRODUCTS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 250,000
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,383 788,394
kWh
Natural Gas $1,383 205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,034

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $163 $200 $163
1,758
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $432 $200 $432
4,396
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $773 $506 $823
8,499
kWh
- $(-50.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $614 $161 $614
6,448
kWh
- -
05 2.7135: Install occupancy sensors $1,003 $603 $1,003
10,551
kWh
- -
06 2.7233: Use properly designed and sized hvac equipment $1,567 $1,320 $1,567
16,413
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $191 $1,072 $191
2,052
kWh
- -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $2,540 $7,500 $2,540
26,671
kWh
- -
09 2.2511: Insulate bare equipment $123 $279 $123
1,172
kWh
- -
10 2.7444: Close holes and openings in building such as broken windows $703 $500 $531
5,569
kWh
$172
-
MMBtu
-
TOTAL RECOMMENDED $8,109 $12,341 $7,987
83,529
kWh
$172
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $3,034 $2,088 $2,912
30,187
kWh
$172
-
MMBtu
$(-50.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs