Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0521 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $7,972 $4,143
UF0521 #04 Y:2018 Use waste heat from hot flue gases to preheat $10,195 $15,000
UF0521 #03 Y:2018 Repair and eliminate steam leaks $13,844 $562
UF0521 #02 Y:2018 Use solar heat to make electricty $41,132 $314,072
UF0521 #01 Y:2018 Increase amount of condensate returned $45,855 $11,386
MI0327 #09 Y:2017 Make a practice of turning off lights when not needed $268 $40
MI0327 #08 Y:2017 Lower temperature during the winter season and vice-versa $1,910 $40
MI0327 #07 Y:2017 Use utility controlled power management $2,349 $80
MI0327 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,001 $8,193
MI0327 #05 Y:2017 Increase amount of waste recovered for resale $3,036 $11,400
MI0327 #04 Y:2017 Install vinyl strip / high speed / air curtain doors $3,743 $520
MI0327 #03 Y:2017 Install vinyl strip / high speed / air curtain doors $5,990 $7,485
MI0327 #02 Y:2017 Turn off equipment when not in use $12,641 $3,600
MI0327 #01 Y:2017 Utilize a less expensive cooling method $14,286 $68,000
SF0513 #05 Y:2017 Replace existing chiller with high efficiency model $64,975 $191,474
SF0513 #04 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $5,395 $10,091
SF0513 #03 Y:2017 Lower light fixtures in high ceiling areas $66,148 $67,793
SF0513 #02 Y:2017 Modify refrigeration system to operate at a lower pressure $177,909 $41,250
SF0513 #01 Y:2017 Turn off equipment when not in use $6,923 -
OR0694 #06 Y:2017 Minimize water usage $8,079 $15,125