Assessment Year | 2018 |
---|---|
Principal Product | Frozen Fruit and Vegetable Juices |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
68,000
ft2
|
Annual Production | 8,000
Tgal
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $386,610 | 4,372,200 |
kWh
|
$0.088 | |
Electricity Demand | $104,802 | 15,480 |
kW-mo/yr
|
$6.77 | |
Electricity Fees | $33,557 | - |
|
- | |
Natural Gas | $128,751 | 15,473 |
MMBtu
|
$8.32 | |
Waste Disposal Costs | |||||
Water Usage | $32,599 | 7,975 |
Tgal
|
$4.09 | |
Water Disposal | $45,255 | 7,975 |
Tgal
|
$5.67 | |
TOTAL YEARLY COSTS | $731,574 | ||||
RECOMMENDED SAVINGS* | $407,909 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $407,909 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $45,855 | $11,386 | - |
$21,557
-
MMBtu
|
$10,269
-
Tgal
|
$14,029
-
Tgal
|
- | - | |
02 | 2.9114: Use solar heat to make electricty | $41,132 | $314,072 |
$41,132
465,292
kWh
|
- | - | - | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $13,844 | $562 | - |
$13,844
-
MMBtu
|
- | - | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $10,195 | $15,000 | - |
$10,195
-
MMBtu
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,972 | $4,143 |
$7,972
90,587
kWh
|
- | - | - | - | - | |
06 | 2.1116: Improve combustion control capability | $3,586 | $2,800 | - |
$3,586
-
MMBtu
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,356 | - |
$1,356
15,339
kWh
|
- | - | - | - | - | |
08 | 2.7135: Install occupancy sensors | $1,160 | $1,149 |
$1,160
13,179
kWh
|
- | - | - | - | - | |
09 | 4.514: Re-arrange equipment layout to reduce handling costs | $39,645 | $66,000 |
$38,475
437,220
kWh
|
- | - | - | $1,170 | - | |
10 | 3.1182: Make a new by-product | $243,164 | $58,810 | - | - | - | - | - | $243,164 | |
TOTAL RECOMMENDED | $407,909 | $473,922 |
$90,095
1,021,617
kWh
|
$49,182
-
MMBtu
|
$10,269
-
Tgal
|
$14,029
-
Tgal
|
$1,170 | $243,164 | ||
TOTAL IMPLEMENTED | $407,909 | $473,922 |
$90,095
1,021,617
kWh
|
$49,182
-
MMBtu
|
$10,269
-
Tgal
|
$14,029
-
Tgal
|
$1,170 | $243,164 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs