ITAC Assessment: DL0088
ITAC logo
ITAC Assessment: DL0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Silicon and Boron Carbide Composite
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 60,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 4,380
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $908,507 11,525,766
kWh
Natural Gas $53,724 3,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $225,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $42,739 $100 $42,739
541,000
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $50,290 $23,500 $50,290
636,587
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $19,620 $7,000 $19,620
248,390
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $21,488 $34,800 $21,488
272,000
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $39,912 $100 $10,112
128,000
kWh
$29,800
-
MMBtu
06 2.4226: Use / purchase optimum sized compressor $20,935 $24,500 $20,935
265,000
kWh
-
07 2.6218: Turn off equipment when not in use $7,749 $100 $7,749
98,092
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,010 $11,800 $15,010
190,000
kWh
-
09 2.2511: Insulate bare equipment $8,200 $1,500 $8,200
103,800
kWh
-
TOTAL RECOMMENDED $225,943 $103,400 $196,143
2,482,869
kWh
$29,800
-
MMBtu
TOTAL IMPLEMENTED $145,965 $43,600 $116,165
1,470,482
kWh
$29,800
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs