ITAC Assessment: CO0261
ITAC logo
ITAC Assessment: CO0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Telecommunications Equipment
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 48,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,194 1,079,132
kWh
Natural Gas $3,886 854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $740 $80 $740
13,189
kWh
-
02 2.7261: Install timers and/or thermostats $2,250 $2,250 $1,130
43,376
kWh
$1,120
-
MMBtu
03 2.7135: Install occupancy sensors $1,200 $1,200 $900
16,120
kWh
$300
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $200 $270
4,982
kWh
-
05 2.7444: Close holes and openings in building such as broken windows $230 $280 $50
879
kWh
$180
-
MMBtu
06 2.2437: Recover waste heat from equipment $770 $2,300 - $770
-
MMBtu
TOTAL RECOMMENDED $5,460 $6,310 $3,090
78,546
kWh
$2,370
-
MMBtu
TOTAL IMPLEMENTED $3,220 $2,610 $1,920
57,444
kWh
$1,300
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs