ITAC Assessment: MS0348
ITAC logo
ITAC Assessment: MS0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Lighting Fixtures
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 130,000
ft2
Annual Production 5,400,000
units
Production Hrs. Annual 6,300
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,127 6,248,400
kWh
Electricity Demand $239,161 16,874
kW-mo/yr
Natural Gas $38,313 36,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2314: Replace heat treating oven with more efficient unit $112,791 $264,425 $54,604
1,061,297
kWh
$56,521
-
kW-mo/yr
$1,666
02 2.2314: Replace heat treating oven with more efficient unit $30,120 $217,605 $18,225
354,239
kWh
$11,450
-
kW-mo/yr
$445
03 2.2314: Replace heat treating oven with more efficient unit $29,394 $103,215 $17,888
347,684
kWh
$11,072
-
kW-mo/yr
$434
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,319 $50,244 $7,999
155,464
kWh
$4,138
-
kW-mo/yr
$182
05 2.7135: Install occupancy sensors $5,041 $300 $4,966
96,526
kWh
- $75
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,658 $2,310 $676
13,145
kWh
$1,943
-
kW-mo/yr
$39
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,423 $378 $2,387
16,399
kWh
- $36
TOTAL RECOMMENDED $194,746 $638,477 $106,745
2,044,754
kWh
$85,124
-
kW-mo/yr
$2,877
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs