| Assessment Year | 2018 |
|---|---|
| Principal Product | Freeze-Dried Fruits, Vegetables and Meats |
| NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
| SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
240,000
ft2
|
| Annual Production | 6,600,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,362,024 | 18,985,441 |
kWh
|
$0.072 |
| Electricity Demand | $582,814 | 32,779 |
kW-mo/yr
|
$17.78 |
| Natural Gas | $260,754 | 40,432 |
MMBtu
|
$6.45 |
| TOTAL YEARLY COSTS | $2,205,592 | |||
| RECOMMENDED SAVINGS* | $321,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $309,032 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $6,923 | - |
$6,923
96,498
kWh
|
- | - | - | |
| 02 | 2.2621: Modify refrigeration system to operate at a lower pressure | $177,909 | $41,250 |
$177,909
2,479,908
kWh
|
- | - | - | |
| 03 | 2.7141: Lower light fixtures in high ceiling areas | $66,148 | $67,793 |
$42,089
586,692
kWh
|
$16,370
-
kW-mo/yr
|
$6,795 | $894 | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,395 | $10,091 |
$5,395
75,204
kWh
|
- | - | - | |
| 05 | 2.2622: Replace existing chiller with high efficiency model | $64,975 | $191,474 |
$48,547
676,712
kWh
|
$16,428
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $321,350 | $310,608 |
$280,863
3,915,014
kWh
|
$32,798
-
kW-mo/yr
|
$6,795 | $894 | ||
| TOTAL IMPLEMENTED | $309,032 | $300,517 |
$268,545
3,743,312
kWh
|
$32,798
-
kW-mo/yr
|
$6,795 | $894 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs