ITAC Assessment: SF0513
ITAC logo
ITAC Assessment: SF0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Freeze-Dried Fruits, Vegetables and Meats
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 240,000
ft2
Annual Production 6,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,362,024 18,985,441
kWh
Electricity Demand $582,814 32,779
kW-mo/yr
Natural Gas $260,754 40,432
MMBtu
TOTAL YEARLY COSTS $2,205,592
RECOMMENDED SAVINGS* $321,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $309,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $6,923 - $6,923
96,498
kWh
- - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $177,909 $41,250 $177,909
2,479,908
kWh
- - -
03 2.7141: Lower light fixtures in high ceiling areas $66,148 $67,793 $42,089
586,692
kWh
$16,370
-
kW-mo/yr
$6,795 $894
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,395 $10,091 $5,395
75,204
kWh
- - -
05 2.2622: Replace existing chiller with high efficiency model $64,975 $191,474 $48,547
676,712
kWh
$16,428
-
kW-mo/yr
- -
TOTAL RECOMMENDED $321,350 $310,608 $280,863
3,915,014
kWh
$32,798
-
kW-mo/yr
$6,795 $894
TOTAL IMPLEMENTED $309,032 $300,517 $268,545
3,743,312
kWh
$32,798
-
kW-mo/yr
$6,795 $894
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs