Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0694 #01 Y:2017 Add equipment/ operators to reduce production bottleneck $190,250 $7,842
OR0626 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,463 $3,437
OR0626 #06 Y:2013 Insulate bare equipment $3,138 $5,659
OR0626 #05 Y:2013 Recover heat from exhausted steam, hot air or hot water $5,445 $6,461
OR0626 #04 Y:2013 Upgrade controls on compressors $7,138 $5,500
OR0626 #03 Y:2013 Improve combustion control capability $11,422 $7,219
OR0626 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $1,945 $1,000
OR0626 #01 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $18,202 $6,792
OR0610 #09 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,145 $5,840
OR0610 #08 Y:2013 Flash condensate to produce lower pressure steam $4,383 $16,215
OR0610 #07 Y:2013 Utilize a less expensive cooling method $6,621 $24,248
OR0610 #06 Y:2013 Upgrade controls on compressors $8,077 $26,477
OR0610 #05 Y:2013 Moderate cooling tower outlet temperature $64,511 $85,275
OR0610 #04 Y:2013 Turn off equipment when not in use $1,406 $2,100
OR0610 #03 Y:2013 Purchase new equipment to reduce material use / cost $161,127 $238,200
OR0610 #02 Y:2013 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $8,287 $11,998
OR0610 #01 Y:2013 Improve combustion control capability $11,054 $11,584
OR0609 #09 Y:2013 Modify refrigeration system to operate at a lower pressure $28,299 $42,000
OR0609 #08 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $4,018 $5,875
OR0609 #07 Y:2013 Utilize controls to operate equipment only when needed $117,782 $160,770