Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0565 #02 Y:2010 Insulate bare equipment $6,110 $21,715
OR0565 #01 Y:2010 Modify refrigeration system to operate at a lower pressure $14,900 $9,340
OR0561 #07 Y:2010 Reduce the pressure of compressed air to the minimum required $3,321 $3,321
OR0561 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,786 $10,046
OR0561 #05 Y:2010 Modify refrigeration system to operate at a lower pressure $90,831 $106,316
OR0561 #04 Y:2010 Use hot process fluids to preheat incoming process fluids $18,820 $19,635
OR0561 #03 Y:2010 Upgrade controls on compressors $14,426 $7,234
OR0561 #02 Y:2010 Use hot process fluids to preheat incoming process fluids $84,544 $24,245
OR0561 #01 Y:2010 Isolate hot or cold equipment $7,124 $1,529
OR0560 #08 Y:2010 Install occupancy sensors $10,085 $70,024
OR0560 #07 Y:2010 Recover waste heat from equipment $36,273 $3,637
OR0560 #06 Y:2010 Optimize plant power factor $11,450 $23,156
OR0560 #05 Y:2010 Utilize controls to operate equipment only when needed $3,400 $7,001
OR0560 #04 Y:2010 Chill water to the highest temperature possible $11,768 -
OR0560 #03 Y:2010 Modify refrigeration system to operate at a lower pressure $8,047 -
OR0560 #02 Y:2010 Re-arrange equipment layout to reduce handling costs $37,651 $90,666
OR0560 #01 Y:2010 Replace existing equipment with more suitable substitutes $68,119 $26,207
OR0558 #06 Y:2010 Modify refrigeration system to operate at a lower pressure $930 $1
OR0558 #05 Y:2010 Use solar heat to make electricty $25,798 $379,829
OR0558 #04 Y:2010 Install occupancy sensors $14,738 $120,911