Assessment Year | 2010 |
---|---|
Principal Product | Bean, Corn, and Squash |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
378,448
ft2
|
Annual Production | 150,000,000
units
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $674,990 | 18,283,680 |
kWh
|
$0.037 |
Electricity Demand | $292,150 | 44,171 |
kW-mo/yr
|
$6.61 |
Natural Gas | $140,293 | 25,103 |
MMBtu
|
$5.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,761 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $6,602 | $2,965 |
$6,602
141,400
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,102 | $7,102 |
$5,665
132,888
kWh
|
$1,437
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,319 | $4,935 |
$1,052
24,696
kWh
|
$267
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $14,738 | $120,911 |
$10,125
237,547
kWh
|
$689
-
kW-mo/yr
|
$3,924 | |
05 | 2.9114: Use solar heat to make electricty | $25,798 | $379,829 |
$22,044
517,104
kWh
|
$3,754
-
kW-mo/yr
|
- | |
06 | 2.2621: Modify refrigeration system to operate at a lower pressure | $930 | $1 |
$930
21,900
kWh
|
- | - | |
TOTAL RECOMMENDED | $56,489 | $515,743 |
$46,418
1,075,535
kWh
|
$6,147
-
kW-mo/yr
|
$3,924 | ||
TOTAL IMPLEMENTED | $29,761 | $135,913 |
$23,444
536,531
kWh
|
$2,393
-
kW-mo/yr
|
$3,924 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs