Assessment Year | 2011 |
---|---|
Principal Product | Canned Vaegatables |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $100 M to 500M |
# of Employees | 225 |
Plant Area |
595,000
ft2
|
Annual Production | 150,000,000
lb
|
Production Hrs. Annual | 5,160
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,021,516 | 24,673,840 |
kWh
|
$0.041 |
Electricity Demand | $254,204 | 59,779 |
kW-mo/yr
|
$4.25 |
Electricity Fees | $74,261 | - |
|
- |
Natural Gas | $800,995 | 136,834 |
MMBtu
|
$5.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,834 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $119,580 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $14,900 | $9,340 |
$14,900
358,000
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $6,110 | $21,715 | - |
$6,110
-
MMBtu
|
|
03 | 2.2531: Re-size charging openings or add movable cover or door | $10,300 | $17,700 |
$10,300
245,401
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,820 | $19,210 |
$6,820
161,754
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,900 | $10,900 |
$10,900
210,000
kWh
|
- | |
06 | 2.2447: Heat water with exhaust heat | $77,370 | $96,750 | - |
$77,370
-
MMBtu
|
|
07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $434 | $1,877 |
$133
3,164
kWh
|
$301
-
MMBtu
|
|
TOTAL RECOMMENDED | $126,834 | $177,492 |
$43,053
978,319
kWh
|
$83,781
-
MMBtu
|
||
TOTAL IMPLEMENTED | $119,580 | $156,405 |
$36,100
813,401
kWh
|
$83,480
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs