ITAC Assessment: OR0565
ITAC logo
ITAC Assessment: OR0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Canned Vaegatables
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 595,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 5,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,021,516 24,673,840
kWh
Electricity Demand $254,204 59,779
kW-mo/yr
Electricity Fees $74,261 -
Natural Gas $800,995 136,834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $14,900 $9,340 $14,900
358,000
kWh
-
02 2.2511: Insulate bare equipment $6,110 $21,715 - $6,110
-
MMBtu
03 2.2531: Re-size charging openings or add movable cover or door $10,300 $17,700 $10,300
245,401
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,820 $19,210 $6,820
161,754
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,900 $10,900 $10,900
210,000
kWh
-
06 2.2447: Heat water with exhaust heat $77,370 $96,750 - $77,370
-
MMBtu
07 2.2444: Use hot process fluids to preheat incoming process fluids $434 $1,877 $133
3,164
kWh
$301
-
MMBtu
TOTAL RECOMMENDED $126,834 $177,492 $43,053
978,319
kWh
$83,781
-
MMBtu
TOTAL IMPLEMENTED $119,580 $156,405 $36,100
813,401
kWh
$83,480
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs