ITAC Assessment: RU0101
ITAC logo
ITAC Assessment: RU0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COSTUME STAMPING
NAICS
n/a
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,853 2,935,815
kWh
Natural Gas $6,569 1,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $976 - $976
8,792
kWh
02 2.2514: Cover open tanks $16,298 $1,468 $16,298
146,835
kWh
03 2.7492: Use proper thickness of insulation on building envelope $34,441 $74,800 $34,441
310,375
kWh
04 2.7494: Install storm windows and doors $545 $750 $545
4,982
kWh
TOTAL RECOMMENDED $52,260 $77,018 $52,260
470,984
kWh
TOTAL IMPLEMENTED $35,962 $75,550 $35,962
324,149
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs