ITAC Assessment: GT0336
ITAC logo
ITAC Assessment: GT0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product COLOR OFFSET PRINTING
NAICS
n/a
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 194
Plant Area
n/a
Annual Production 27,000,000
lb
Production Hrs. Annual 4,896
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,391 5,957,796
kWh
Natural Gas $13,723 1,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,025 $19,500 $6,025
116,354
kWh
02 2.4133: Use most efficient type of electric motors $228 $228 $228
4,396
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,130 - $1,130
21,688
kWh
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $5,790 $1,600 $5,790
125,147
kWh
05 2.5194: Redesign process $2,610 $2,100 $2,610
21,395
kWh
TOTAL RECOMMENDED $15,783 $23,428 $15,783
288,980
kWh
TOTAL IMPLEMENTED $9,765 $21,600 $9,765
159,437
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs