| Assessment Year | 1998 |
|---|---|
| Principal Product | Aircraft Fuel Systems |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 240 |
| Plant Area |
163,000
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $149,093 | 2,272,861 |
kWh
|
$0.066 |
| Electricity Demand | $115,816 | 11,652 |
kW-mo/yr
|
$9.94 |
| Natural Gas | $10,624 | 1,919 |
MMBtu
|
$5.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $97,921 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,455 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $3,037 | $3,300 |
$1,684
25,498
kWh
|
$1,353
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,700 | $250 |
$2,052
31,067
kWh
|
$1,648
-
kW-mo/yr
|
- | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $3,973 | $6,500 |
$1,319
19,930
kWh
|
$2,654
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,304 | - |
$723
10,844
kWh
|
$581
-
kW-mo/yr
|
- | |
| 05 | 2.6218: Turn off equipment when not in use | $840 | - |
$393
5,862
kWh
|
$447
-
kW-mo/yr
|
- | |
| 06 | 2.3192: Use fossil fuel powered generator during peak demand periods | $51,824 | - | - |
$51,824
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,601 | $24,427 |
$7,848
118,699
kWh
|
$5,753
-
kW-mo/yr
|
- | |
| 08 | 2.1331: Burn a less expensive grade of fuel | $12,852 | - | - | - | $12,852 | |
| 09 | 4.421: Modify current incentive program | $6,790 | - | - | - | $6,790 | |
| TOTAL RECOMMENDED | $97,921 | $34,477 |
$14,019
211,900
kWh
|
$64,260
-
kW-mo/yr
|
$19,642 | ||
| TOTAL IMPLEMENTED | $26,455 | $34,477 |
$14,019
211,900
kWh
|
$12,436
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs