ITAC Assessment: SD0167
ITAC logo
ITAC Assessment: SD0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Aircraft Fuel Systems
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 163,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,093 2,272,861
kWh
Electricity Demand $115,816 11,652
kW-mo/yr
Natural Gas $10,624 1,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $3,037 $3,300 $1,684
25,498
kWh
$1,353
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,700 $250 $2,052
31,067
kWh
$1,648
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $3,973 $6,500 $1,319
19,930
kWh
$2,654
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,304 - $723
10,844
kWh
$581
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $840 - $393
5,862
kWh
$447
-
kW-mo/yr
-
06 2.3192: Use fossil fuel powered generator during peak demand periods $51,824 - - $51,824
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,601 $24,427 $7,848
118,699
kWh
$5,753
-
kW-mo/yr
-
08 2.1331: Burn a less expensive grade of fuel $12,852 - - - $12,852
09 4.421: Modify current incentive program $6,790 - - - $6,790
TOTAL RECOMMENDED $97,921 $34,477 $14,019
211,900
kWh
$64,260
-
kW-mo/yr
$19,642
TOTAL IMPLEMENTED $26,455 $34,477 $14,019
211,900
kWh
$12,436
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs