ITAC Assessment: UL0192
ITAC logo
ITAC Assessment: UL0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Metal Building Components
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 212,500
ft2
Annual Production 41,000,000
lb
Production Hrs. Annual 4,576
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,513 2,189,918
kWh
Electricity Demand $66,302 9,054
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $481,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,015 $20 $576
24,033
kWh
$439
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $185 $152 $96
4,103
kWh
$89
-
kW-mo/yr
- -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $5,083 - - - $5,083
-
lb
-
04 3.5316: Contract a wood pallet recycling company $2,977 - - - $2,977
-
lb
-
05 4.521: Clear and rent existing space $472,500 $705,000 - - - $472,500
TOTAL RECOMMENDED $481,760 $705,172 $672
28,136
kWh
$528
-
kW-mo/yr
$8,060
-
lb
$472,500
TOTAL IMPLEMENTED $6,283 $172 $672
28,136
kWh
$528
-
kW-mo/yr
$5,083
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs