ITAC Assessment: MO0236
ITAC logo
ITAC Assessment: MO0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Banking Equipment and Drive-up Windows
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 75,600
ft2
Annual Production 106,742
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,044 1,331,770
kWh
Electricity Demand $9,513 389
kW-mo/yr
Electricity Fees $11,668 -
Natural Gas $83,982 14,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $1,048 $2,700 - - - - $1,048
02 4.632: Change operating conditions $553 $380 - - - - $553
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,270 $1,717 $1,074
17,292
kWh
$196
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $930 $232 $783
12,603
kWh
$147
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $1,639 $2,805 $1,492
24,033
kWh
$147
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $206 - $182
2,931
kWh
$24
-
kW-mo/yr
- - -
07 3.5311: Recover and reuse waste material $49,600 $15,000 - - - $49,600
-
lb
-
08 3.3128: Utilize other methods to remove contaminants $3,864 $10,000 - - $3,864
-
gal
- -
TOTAL RECOMMENDED $59,110 $32,834 $3,531
56,859
kWh
$514
-
kW-mo/yr
$3,864
-
gal
$49,600
-
lb
$1,601
TOTAL IMPLEMENTED $53,268 $19,902 $2,748
44,256
kWh
$367
-
kW-mo/yr
- $49,600
-
lb
$553
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs