ITAC Assessment: OR0145
ITAC logo
ITAC Assessment: OR0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CHROME ELECTROPLATING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area
n/a
Annual Production 12,148
lb
Production Hrs. Annual 3,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,645 1,617,233
kWh
Natural Gas $2,702 490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4239: Eliminate or reduce compressed air usage $956 - $956
43,962
kWh
02 2.4239: Eliminate or reduce compressed air usage $824 $2,400 $824
37,808
kWh
03 2.4239: Eliminate or reduce compressed air usage $208 $1,764 $208
9,672
kWh
04 2.3212: Optimize plant power factor $1,373 $870 $1,373
-
kWh
05 2.4133: Use most efficient type of electric motors $82 $1,625 $82
2,345
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 $7,421 $360
13,189
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $945 $4,741 $945
43,376
kWh
08 2.2511: Insulate bare equipment $1,297 $6,740 $1,297
59,496
kWh
TOTAL RECOMMENDED $6,045 $25,561 $6,045
209,848
kWh
TOTAL IMPLEMENTED $4,748 $18,821 $4,748
150,352
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs