ITAC Assessment: OR0560
ITAC logo
ITAC Assessment: OR0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Chopped and Whole Onions
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 35,000
ft2
Annual Production 51,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,719 9,336,640
kWh
Natural Gas $70,660 7,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $186,793 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 4.652: Replace existing equipment with more suitable substitutes $68,119 $26,207 - - - $68,119
02 4.514: Re-arrange equipment layout to reduce handling costs $37,651 $90,666 $37,651
190,864
kWh
- - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $8,047 - $8,047
239,500
kWh
- - -
04 2.2625: Chill water to the highest temperature possible $11,768 - $11,768
317,443
kWh
- - -
05 2.6231: Utilize controls to operate equipment only when needed $3,400 $7,001 $3,400
101,700
kWh
- - -
06 2.3212: Optimize plant power factor $11,450 $23,156 - - $11,450 -
07 2.2437: Recover waste heat from equipment $36,273 $3,637 - $36,273
-
MMBtu
- -
08 2.7135: Install occupancy sensors $10,085 $70,024 $10,085
225,360
kWh
- - -
TOTAL RECOMMENDED $186,793 $220,691 $70,951
1,074,867
kWh
$36,273
-
MMBtu
$11,450 $68,119
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs