| Assessment Year | 2000 |
|---|---|
| Principal Product | Steel Wool Pads |
| NAICS |
n/a
|
| SIC | 3291: Abrasive Products |
| Sales Range | $50 M to 100M |
| # of Employees | 114 |
| Plant Area |
250,000
ft2
|
| Annual Production | 600,000,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $241,671 | 6,883,353 |
kWh
|
$0.035 |
| Electricity Demand | $215,418 | 15,327 |
kW-mo/yr
|
$14.05 |
| Electricity Fees | $25,719 | - |
|
- |
| Natural Gas | $406,763 | 166,258 |
MMBtu
|
$2.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $427,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,068 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $302,692 | $770,000 |
$170,638
4,674,971
kWh
|
$192,984
-
kW-mo/yr
|
$(-57,873.0)
-
MMBtu
|
$(-3,057.0) | |
| 02 | 4.126: Install sensors to detect defects | $100,000 | $70,000 | - | - | - | $100,000 | |
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $8,830 | $26,500 |
$2,909
79,719
kWh
|
$5,921
-
kW-mo/yr
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,131 | $5,808 |
$4,221
115,768
kWh
|
$4,910
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,017 | - |
$486
13,189
kWh
|
$531
-
kW-mo/yr
|
- | - | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $3,168 | $7,500 | - |
$3,168
-
kW-mo/yr
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,922 | $600 |
$2,045
55,979
kWh
|
$877
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $427,760 | $880,408 |
$180,299
4,939,626
kWh
|
$208,391
-
kW-mo/yr
|
$(-57,873.0)
-
MMBtu
|
$96,943 | ||
| TOTAL IMPLEMENTED | $25,068 | $40,408 |
$9,661
264,655
kWh
|
$15,407
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs