*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0626 #01 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $18,202 $6,792
OR0610 #09 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,145 $5,840
OR0610 #08 Y:2013 Flash condensate to produce lower pressure steam $4,383 $16,215
OR0610 #07 Y:2013 Utilize a less expensive cooling method $6,621 $24,248
OR0610 #06 Y:2013 Upgrade controls on compressors $8,077 $26,477
OR0610 #05 Y:2013 Moderate cooling tower outlet temperature $64,511 $85,275
OR0610 #04 Y:2013 Turn off equipment when not in use $1,406 $2,100
OR0610 #03 Y:2013 Purchase new equipment to reduce material use / cost $161,127 $238,200
OR0610 #02 Y:2013 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $8,287 $11,998
OR0610 #01 Y:2013 Improve combustion control capability $11,054 $11,584
OR0609 #09 Y:2013 Modify refrigeration system to operate at a lower pressure $28,299 $42,000
OR0609 #08 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $4,018 $5,875
OR0609 #07 Y:2013 Utilize controls to operate equipment only when needed $117,782 $160,770
OR0609 #06 Y:2013 Use closed cycle process to minimize waste water production $142,102 $374,500
OR0609 #05 Y:2013 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $4,900 $4,480
OR0609 #04 Y:2013 Improve combustion control capability $6,499 $5,792
OR0609 #03 Y:2013 Turn off equipment when not in use $3,555 $4,200
OR0609 #02 Y:2013 Insulate bare equipment $4,347 $4,299
OR0609 #01 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $13,082 $4,037
MI0225 #10 Y:2012 Install vinyl strip / high speed / air curtain doors $1,046 $255