Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Fruit Juice Concentrates
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 467,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,209,860 18,060,000
kWh
Electricity Demand $215,491 33,360
kW-mo/yr
Electricity Fees $88,271 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $176,461

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $114,097 $23,031 $100,751
1,503,744
kWh
$13,346
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,492 $29,008 $26,256
364,663
kWh
$3,236
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $27,049 $190,339 $13,453
200,791
kWh
$13,596
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,052 $1,660 $15,880
237,015
kWh
$3,172
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $13,619 $520 $12,026
179,504
kWh
$1,593
-
kW-mo/yr
-
06 2.3137: Use power during off-peak periods $11,955 $800 - - $11,955
07 2.2447: Heat water with exhaust heat $5,925 $8,000 $3,495
52,162
kWh
$2,430
-
kW-mo/yr
-
08 2.7491: Insulate glazing, walls, ceilings, and roofs $2,502 $2,372 $2,211
32,996
kWh
$291
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,598 $80 $1,311
19,563
kWh
$287
-
kW-mo/yr
-
10 2.7447: Install vinyl strip / high speed / air curtain doors $1,046 $255 $923
13,771
kWh
$123
-
kW-mo/yr
-
TOTAL RECOMMENDED $226,335 $256,065 $176,306
2,604,209
kWh
$38,074
-
kW-mo/yr
$11,955
TOTAL IMPLEMENTED $176,461 $215,885 $144,344
2,154,388
kWh
$32,117
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs