matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0757 #04 Y:2022 | 04 | 2022 | Add equipment/ operators to reduce production bottleneck | $194,400 | $300,000 | |
| OR0757 #03 Y:2022 | 03 | 2022 | Install automatic packing equipment | $97,200 | $50,000 | |
| OR0757 #02 Y:2022 | 02 | 2022 | Optimize production lot sizes and inventories | $26,900 | - | |
| OR0757 #01 Y:2022 | 01 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,612 | - | |
| OR0704 #06 Y:2018 | 06 | 2018 | Modify facility to avoid excess maintenance costs | $5,586 | $14,266 | |
| OR0704 #05 Y:2018 | 05 | 2018 | Recover heat from exhausted steam, hot air or hot water | $12,192 | $2,161 | |
| OR0704 #04 Y:2018 | 04 | 2018 | Minimize water usage | $28,545 | $540 | |
| OR0704 #03 Y:2018 | 03 | 2018 | Use waste heat from hot flue gases to preheat | $40,837 | $72,155 | |
| OR0704 #02 Y:2018 | 02 | 2018 | Utilize a less expensive cooling method | $127,144 | $201,450 | |
| OR0704 #01 Y:2018 | 01 | 2018 | Use filter and drying oven to reduce sludge volume | $510,333 | $740,000 | |
| OR0694 #06 Y:2017 | 06 | 2017 | Minimize water usage | $8,079 | $15,125 | |
| OR0694 #05 Y:2017 | 05 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,605 | $10,606 | |
| OR0694 #04 Y:2017 | 04 | 2017 | Install equipment (eg compactor) to reduce disposal costs | $29,962 | $12,100 | |
| OR0694 #03 Y:2017 | 03 | 2017 | Install back-up equipment | $219,130 | $45,000 | |
| OR0694 #02 Y:2017 | 02 | 2017 | Begin a practice of predictive / preventative maintenance | $78,503 | $7,018 | |
| OR0694 #01 Y:2017 | 01 | 2017 | Add equipment/ operators to reduce production bottleneck | $190,250 | $7,842 | |
| OR0653 #06 Y:2015 | 06 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,625 | $1,000 | |
| OR0653 #05 Y:2015 | 05 | 2015 | Modify refrigeration system to operate at a lower pressure | $4,262 | $15,398 | |
| OR0653 #04 Y:2015 | 04 | 2015 | Utilize controls to operate equipment only when needed | $611 | $1,058 | |
| OR0653 #03 Y:2015 | 03 | 2015 | Use optimum thickness insulation | $3,897 | $4,580 |