Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

129

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fruit and vegetable preserving and specialty food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0757 #04 Y:2022 Add equipment/ operators to reduce production bottleneck $194,400 $300,000
OR0757 #03 Y:2022 Install automatic packing equipment $97,200 $50,000
OR0757 #02 Y:2022 Optimize production lot sizes and inventories $26,900 -
OR0757 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,612 -
OR0704 #06 Y:2018 Modify facility to avoid excess maintenance costs $5,586 $14,266
OR0704 #05 Y:2018 Recover heat from exhausted steam, hot air or hot water $12,192 $2,161
OR0704 #04 Y:2018 Minimize water usage $28,545 $540
OR0704 #03 Y:2018 Use waste heat from hot flue gases to preheat $40,837 $72,155
OR0704 #02 Y:2018 Utilize a less expensive cooling method $127,144 $201,450
OR0704 #01 Y:2018 Use filter and drying oven to reduce sludge volume $510,333 $740,000
OR0694 #06 Y:2017 Minimize water usage $8,079 $15,125
OR0694 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,605 $10,606
OR0694 #04 Y:2017 Install equipment (eg compactor) to reduce disposal costs $29,962 $12,100
OR0694 #03 Y:2017 Install back-up equipment $219,130 $45,000
OR0694 #02 Y:2017 Begin a practice of predictive / preventative maintenance $78,503 $7,018
OR0694 #01 Y:2017 Add equipment/ operators to reduce production bottleneck $190,250 $7,842
OR0653 #06 Y:2015 Reduce the pressure of compressed air to the minimum required $1,625 $1,000
OR0653 #05 Y:2015 Modify refrigeration system to operate at a lower pressure $4,262 $15,398
OR0653 #04 Y:2015 Utilize controls to operate equipment only when needed $611 $1,058
OR0653 #03 Y:2015 Use optimum thickness insulation $3,897 $4,580