78
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Nonchocolate confectionery manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0217 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $1,794 | $5,550 | |
UU0217 #04 Y:2023 | 04 | 2023 | Upgrade controls on compressors | $2,013 | $1,020 | |
UU0217 #03 Y:2023 | 03 | 2023 | Install compressor air intakes in coolest locations | $4,807 | $8,910 | |
UU0217 #02 Y:2023 | 02 | 2023 | Use cooling tower or economizer to replace chiller cooling | $9,500 | $51,330 | |
UU0217 #01 Y:2023 | 01 | 2023 | Install anaerobic digester | $648,030 | $7,400,000 | |
CM1010 #07 Y:2022 | 07 | 2022 | Turn off equipment when not in use | $14,400 | - | |
CM1010 #06 Y:2022 | 06 | 2022 | Improve handling practices | $1,056 | $9,800 | |
CM1010 #05 Y:2022 | 05 | 2022 | Increase efficiency of trucks | $6,350 | $48,100 | |
CM1010 #04 Y:2022 | 04 | 2022 | Insulate glazing, walls, ceilings, and roofs | $7,500 | $12,400 | |
CM1010 #03 Y:2022 | 03 | 2022 | Substitute compressed air cooling with water or air cooling | $101,930 | $41,000 | |
CM1010 #02 Y:2022 | 02 | 2022 | Utilize higher efficiency lamps and/or ballasts | $7,190 | $17,940 | |
CM1010 #01 Y:2022 | 01 | 2022 | Use solar heat to make electricty | $54,241 | $557,400 | |
IC0237 #07 Y:2019 | 07 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $628 | $200 | |
IC0237 #06 Y:2019 | 06 | 2019 | Install / repair insulation on condensate lines | $817 | $1,111 | |
IC0237 #05 Y:2019 | 05 | 2019 | Install occupancy sensors | $1,275 | $177 | |
IC0237 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $10,251 | $2,864 | |
IC0237 #03 Y:2019 | 03 | 2019 | Recharge batteries on during off-peak demand periods | $1,125 | - | |
IC0237 #02 Y:2019 | 02 | 2019 | Replace electrically-operated equipment with fossil fuel equipment | $32,993 | $2,764 | |
IC0237 #01 Y:2019 | 01 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,797 | $2,350 | |
OR0652 #05 Y:2015 | 05 | 2015 | Modify refrigeration system to operate at a lower pressure | $5,000 | $15,000 |