ITAC Assessment: CM1010
ITAC logo
ITAC Assessment: CM1010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hard Candy, Chocolate, Marshmallows, Caramel Popcorn
NAICS 311340: Nonchocolate Confectionery Manufacturing
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 90,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 3,600
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,375 765,680
kWh
Electricity Demand $43,146 2,194
kW-mo/yr
Electricity Fees $5,150 -
Natural Gas $26,888 3,050
MMBtu
Waste Disposal Costs
Water Usage $18,848 1,436
Tgal
TOTAL YEARLY COSTS $129,407
RECOMMENDED SAVINGS* $192,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,246

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $54,241 $557,400 $34,291
743,000
kWh
$19,950
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,190 $17,940 $3,250
70,300
kWh
$3,940
-
kW-mo/yr
- - -
03 2.4237: Substitute compressed air cooling with water or air cooling $101,930 $41,000 $1,720
36,800
kWh
$4,210
-
kW-mo/yr
- $96,000 -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $7,500 $12,400 - - $7,500
-
MMBtu
- -
05 2.8226: Increase efficiency of trucks $6,350 $48,100 $150
3,170
kWh
- - - $6,200
06 3.7121: Improve handling practices $1,056 $9,800 $(-444.0)
(-9,620)
kWh
- - - $1,500
07 2.6218: Turn off equipment when not in use $14,400 - - - $14,400
-
MMBtu
- -
TOTAL RECOMMENDED $192,667 $686,640 $38,967
843,650
kWh
$28,100
-
kW-mo/yr
$21,900
-
MMBtu
$96,000 $7,700
TOTAL IMPLEMENTED $8,246 $27,740 $2,806
60,680
kWh
$3,940
-
kW-mo/yr
- - $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs