ITAC Assessment: UU0217
ITAC logo
ITAC Assessment: UU0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Candy
NAICS 311340: Nonchocolate Confectionery Manufacturing
SIC 2064: Candy and Other Confectionery Products
Sales Range $100
M
to 500
M
# of Employees 215
Plant Area 220,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $413,196 12,064,141
kWh
Electricity Demand $459,780 48,808
kW-mo/yr
Electricity Fees $106,866 -
Natural Gas $559,770 68,160
MMBtu
Waste Disposal Costs
Water Usage $66,680 35,240
Tgal
Water Disposal $868,830 35,240
Tgal
TOTAL YEARLY COSTS $2,475,122
RECOMMENDED SAVINGS* $666,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $664,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.9141: Install anaerobic digester $648,030 $7,400,000 - - $430
-
MMBtu
$647,600
-
Tgal
02 2.2614: Use cooling tower or economizer to replace chiller cooling $9,500 $51,330 $8,596
252,812
kWh
$904
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $4,807 $8,910 $3,484
102,485
kWh
$1,323
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $2,013 $1,020 $1,606
47,229
kWh
$407
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,794 $5,550 $1,302
38,298
kWh
$492
-
kW-mo/yr
- -
TOTAL RECOMMENDED $666,144 $7,466,810 $14,988
440,824
kWh
$3,125
-
kW-mo/yr
$430
-
MMBtu
$647,600
-
Tgal
TOTAL IMPLEMENTED $664,350 $7,461,260 $13,686
402,526
kWh
$2,634
-
kW-mo/yr
$430
-
MMBtu
$647,600
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs