Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonchocolate confectionery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0217 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,794 $5,550
UU0217 #04 Y:2023 Upgrade controls on compressors $2,013 $1,020
UU0217 #03 Y:2023 Install compressor air intakes in coolest locations $4,807 $8,910
UU0217 #02 Y:2023 Use cooling tower or economizer to replace chiller cooling $9,500 $51,330
UU0217 #01 Y:2023 Install anaerobic digester $648,030 $7,400,000
CM1010 #07 Y:2022 Turn off equipment when not in use $14,400 -
CM1010 #06 Y:2022 Improve handling practices $1,056 $9,800
CM1010 #05 Y:2022 Increase efficiency of trucks $6,350 $48,100
CM1010 #04 Y:2022 Insulate glazing, walls, ceilings, and roofs $7,500 $12,400
CM1010 #03 Y:2022 Substitute compressed air cooling with water or air cooling $101,930 $41,000
CM1010 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $7,190 $17,940
CM1010 #01 Y:2022 Use solar heat to make electricty $54,241 $557,400
IC0237 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $628 $200
IC0237 #06 Y:2019 Install / repair insulation on condensate lines $817 $1,111
IC0237 #05 Y:2019 Install occupancy sensors $1,275 $177
IC0237 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,251 $2,864
IC0237 #03 Y:2019 Recharge batteries on during off-peak demand periods $1,125 -
IC0237 #02 Y:2019 Replace electrically-operated equipment with fossil fuel equipment $32,993 $2,764
IC0237 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $5,797 $2,350
OR0652 #05 Y:2015 Modify refrigeration system to operate at a lower pressure $5,000 $15,000