Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Malt manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0777 #03 Y:2023 Eliminate or reduce compressed air usage $2,570 -
OR0777 #02 Y:2023 Install common header on compressors $2,832 $6,989
OR0777 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $8,479 -
AS0526 #04 Y:2022 Change rate schedules or other changes in utility service $368 $200
AS0526 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $598 $1,116
AS0526 #02 Y:2022 Analyze flue gas for proper air/fuel ratio $1,336 $650
AS0526 #01 Y:2022 Apply for tax-free status for energy purchases $8,135 $500
BS0153 #04 Y:2021 Use or replace with energy efficient substitutes $98,310 $307,800
BS0153 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $733 $490
BS0153 #02 Y:2021 Use most efficient type of electric motors $36,134 $5,961
BS0153 #01 Y:2021 Install occupancy sensors $30,759 $3,726
CL2102 #04 Y:2021 Turn off equipment when not in use $6,049 -
CL2102 #03 Y:2021 Utilize energy-efficient belts and other improved mechanisms $2,176 $2,846
CL2102 #02 Y:2021 Install occupancy sensors $322 $453
CL2102 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $10,814 $3,180
OR0629 #04 Y:2014 Replace boiler $523,306 $3,403,664
OR0629 #03 Y:2014 Recover and reuse cooling water $58,681 $3,764
OR0629 #02 Y:2014 Re-use or recycle hot or cold process exhaust air $37,863 $38,930
OR0629 #01 Y:2014 Redesign flow to minimize mass transfer length $37,907 $21,000
WI0521 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $630 -