ITAC Assessment: WI0521
ITAC logo
ITAC Assessment: WI0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product malt
NAICS 311213: Malt Manufacturing
SIC 2083: Malt
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area
n/a
Annual Production 70,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,259 8,988,280
kWh
Electricity Demand $139,983 19,139
kW-mo/yr
Natural Gas $160,277 26,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 3.3128: Utilize other methods to remove contaminants $222,888 $230,600 - - - $222,888
-
gal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,408 $13,600 $7,270
194,922
kWh
$2,138
-
kW-mo/yr
- -
03 2.2621: Modify refrigeration system to operate at a lower pressure $6,900 $18,000 $2,256
60,480
kWh
$4,644
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $5,386 $11,000 - - $5,386
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,630 $3,200 $1,151
30,853
kWh
$479
-
kW-mo/yr
- -
06 2.3132: Recharge batteries on during off-peak demand periods $1,035 $500 - $1,035
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $630 - $448
12,011
kWh
$182
-
kW-mo/yr
- -
TOTAL RECOMMENDED $247,877 $276,900 $11,125
298,266
kWh
$8,478
-
kW-mo/yr
$5,386
-
MMBtu
$222,888
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs