ITAC Assessment: WI0202
ITAC logo
ITAC Assessment: WI0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Food processing equipment: hammer mills, airlocks, mixers, g
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 75,000
ft2
Annual Production 590
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,910 368,406
kWh
Natural Gas $31,296 7,338
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $11,110 $500 - - $11,110
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,157 $4,594 - $3,157
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,862 $2,500 - $2,862
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,092 $1,764 $1,092
8,499
kWh
- -
05 2.7135: Install occupancy sensors $280 $150 $280
2,345
kWh
- -
06 2.7134: Use photocell controls $179 $75 $179
1,465
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $833 - $833
-
kWh
- -
08 2.7221: Lower temperature during the winter season and vice-versa $609 $400 - $609
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $451 - $451
3,517
kWh
- -
10 2.4221: Install compressor air intakes in coolest locations $321 $1,280 $321
2,638
kWh
- -
TOTAL RECOMMENDED $20,894 $11,263 $3,156
18,464
kWh
$6,628
-
MMBtu
$11,110
TOTAL IMPLEMENTED $13,262 $2,664 $1,543
12,016
kWh
$609
-
MMBtu
$11,110
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs