Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flour milling
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0384 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $710 $735
IA0384 #02 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $4,970 $1,000
IA0384 #01 Y:2005 Reduce the pressure of compressed air to the minimum required $2,454 $200
SF0316 #07 Y:2005 Optimize plant power factor $1,998 $3,852
SF0316 #06 Y:2005 Use most efficient type of electric motors $2,504 $2,562
SF0316 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,320 $1,512
SF0316 #04 Y:2005 Install / repair insulation on steam lines $43,493 $15,595
SF0316 #03 Y:2005 Remove or close off unneeded compressed air lines $472 -
SF0316 #02 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $4,068 -
SF0316 #01 Y:2005 Repair and eliminate steam leaks $4,516 -
OR0490 #08 Y:2005 Optimize plant power factor $2,750 $5,600
OR0490 #07 Y:2005 Turn off equipment during breaks, reduce operating time $1,720 -
OR0490 #06 Y:2005 Reduce illumination to minimum necessary levels $8,100 $1,800
OR0490 #05 Y:2005 Eliminate or reduce compressed air usage $7,600 -
OR0490 #04 Y:2005 Add equipment/ operators to reduce production bottleneck $10,400 $1,000
OR0490 #03 Y:2005 Regrind, reuse, or sell scrap plastic parts $24,000 -
OR0490 #02 Y:2005 Use less wasteful packaging $23,500 $1,000
OR0490 #01 Y:2005 Use less wasteful packaging $35,000 $1,000
CO0565 #08 Y:2005 Install occupancy sensors $130 $210
CO0565 #07 Y:2005 Utilize higher efficiency lamps and/or ballasts $200 $500