ITAC Assessment: CO0565
ITAC logo
ITAC Assessment: CO0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Flour
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 23,500
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,362 4,139,601
kWh
Electricity Demand $127,942 9,790
kW-mo/yr
Electricity Fees $192 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,830 $26,240 $3,660
110,800
kWh
$1,170
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,150 $1,210 $560
16,806
kWh
$590
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,930 $8,780 $2,080
62,800
kWh
$1,850
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,830 $270 $1,830
55,500
kWh
$1,000
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $1,160 $4,070 $590
17,700
kWh
$570
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $490 $500 $1,240
37,500
kWh
- $(-750.0) -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $200 $500 $50
1,500
kWh
$30
-
kW-mo/yr
$50 $70
08 2.7135: Install occupancy sensors $130 $210 $120
3,500
kWh
- - $10
TOTAL RECOMMENDED $14,720 $41,780 $10,130
306,106
kWh
$5,210
-
kW-mo/yr
$(-700.0) $80
TOTAL IMPLEMENTED $4,470 $1,980 $3,630
109,806
kWh
$1,590
-
kW-mo/yr
$(-750.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs