ITAC Assessment: LT0076
ITAC logo
ITAC Assessment: LT0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product STEEL CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 1,125
ton
Production Hrs. Annual 2,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,442 1,946,952
kWh
Natural Gas $45,153 10,914
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1122: Re-size charging openings or add a movable door on equipment $6,000 $100 $6,000
73,271
kWh
-
02 2.3212: Optimize plant power factor $5,900 $5,100 $5,900
-
kWh
-
03 2.7261: Install timers and/or thermostats $870 $300 $630
10,844
kWh
$240
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,105 $463 $1,105
13,189
kWh
-
05 2.4133: Use most efficient type of electric motors $412 $730 $412
4,689
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $164 $94 $164
2,052
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,904 $2,885 $2,904
7,034
kWh
-
TOTAL RECOMMENDED $17,355 $9,672 $17,115
111,079
kWh
$240
-
MMBtu
TOTAL IMPLEMENTED $2,551 $1,587 $2,311
30,774
kWh
$240
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs