ITAC Assessment: MI0133
ITAC logo
ITAC Assessment: MI0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 60,000
ft2
Annual Production 33,600,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,389 7,787,842
kWh
Electricity Demand $154,558 18,979
kW-mo/yr
Electricity Fees $75,970 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $131,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2136: Install / repair insulation on steam lines $86,700 $3,400 $85,438
1,137,650
kWh
$1,262
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $34,704 - $34,200
454,260
kWh
$504
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,100 $10,050 $3,456
46,085
kWh
$644
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,584 $964 $2,099
27,953
kWh
$485
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,755 $30 $1,450
19,304
kWh
$305
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $1,350 $3,400 $1,193
15,884
kWh
$157
-
kW-mo/yr
TOTAL RECOMMENDED $131,193 $17,844 $127,836
1,701,136
kWh
$3,357
-
kW-mo/yr
TOTAL IMPLEMENTED $39,043 $994 $37,749
501,517
kWh
$1,294
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs