ITAC Assessment: LE0318
ITAC logo
ITAC Assessment: LE0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Mltiwall paper bags
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 191,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,720 4,185,800
kWh
Electricity Demand $46,266 7,126
kW-mo/yr
Natural Gas $33,875 7,440
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,279 $1,300 $4,671
58,384
kWh
$608
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $2,106 $200 $1,820
22,751
kWh
$286
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $2,316 $2,000 - - $2,316
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,558 $240 $1,402
17,529
kWh
$156
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $83,751 $81,700 $80,056
953,045
kWh
$3,554
-
kW-mo/yr
- $141
06 2.7142: Utilize higher efficiency lamps and/or ballasts $24,213 $52,000 $21,974
261,591
kWh
$2,239
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $887 $300 $887
10,562
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,467 $34,200 $3,255
40,688
kWh
$725
-
kW-mo/yr
- $487
TOTAL RECOMMENDED $124,577 $171,940 $114,065
1,364,550
kWh
$7,568
-
kW-mo/yr
$2,316
-
MMBtu
$628
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs