ITAC Assessment: OR0490
ITAC logo
ITAC Assessment: OR0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bulk flour & sugar
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 76
Plant Area 120,000
ft2
Annual Production 110,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,090 3,084,980
kWh
Electricity Demand $5,921 7,008
kW-mo/yr
Electricity Fees $2,823 -
Natural Gas $11,963 1,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 3.1162: Use less wasteful packaging $35,000 $1,000 - - - - - - $35,000
02 3.1162: Use less wasteful packaging $23,500 $1,000 - - - - - - $23,500
03 3.5212: Regrind, reuse, or sell scrap plastic parts $24,000 - - - - $24,000
-
lb
- - -
04 4.111: Add equipment/ operators to reduce production bottleneck $10,400 $1,000 - - - - $10,400 - -
05 2.4239: Eliminate or reduce compressed air usage $7,600 - $630
10,600
kWh
$20
-
kW-mo/yr
- - $6,200 $750 -
06 2.7111: Reduce illumination to minimum necessary levels $8,100 $1,800 $6,500
112,200
kWh
- - - $1,600 - -
07 2.6212: Turn off equipment during breaks, reduce operating time $1,720 - $1,720
29,600
kWh
- - - - - -
08 2.3212: Optimize plant power factor $2,750 $5,600 - - $2,750 - - - -
TOTAL RECOMMENDED $113,070 $10,400 $8,850
152,400
kWh
$20
-
kW-mo/yr
$2,750 $24,000
-
lb
$18,200 $750 $58,500
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs